1. Check the
dimensions
Before installing, check the total height of the components to
ensure the correct finished level is achieved. Allowance must be
made for the thickness of any membranes used and, where applicable,
roof insulation.
|
 |
2. Fit spigot and check
outlets
Screw spigot, where required, into the body, using a suitable
sealant to create a watertight joint. Position the body in the roof
deck and ensure the outlet is accessible.
|
 |